BC Hydro launches second phase of vehicle charging stations across southern B.C.

Stations are located in Metro Vancouver, Vancouver Island, East Kootenay and Okanagan

BC Hydro is expanding its network of electric vehicle charging stations.

The Crown utility says 28 new stations complete the second phase of its fast-charging network and are in addition to the 30 stations opened in 2016.

Thirteen of the stations are in Metro Vancouver, seven are on Vancouver Island, including one at the Pacific Rim Visitor Centre near Tofino, another is in Campbell River, and two have opened on the Coquihalla Highway at the Britton Creek rest area.

A further six stations are located throughout the East Kootenay and BC Hydro says the next phase of its program will connect drivers travelling between Kamloops and Prince George, while stations in Prince Rupert are also being planned.

Hydro spokeswoman Mora Scott says the stations can charge an electric vehicle to 80 per cent in just 30 minutes, at a cost of 35 cents per kilowatt hour.

Mora Scott says that translates to roughly $3.50 for the equivalent of a full tank of gas in the average four-cylinder car.

“The number of electric vehicles on B.C. roads is increasing, there’s currently around 9,000 across the province, and we actually expect that number to rise to 300,000 by 2030,” Scott says in a news release.

In partnership with municipalities, regional districts and several businesses, BC Hydro has been installing charging stations throughout the province since 2012 with support from the provincial and federal governments.

Scott says the utility wants to ensure the stations are placed where drivers need them so charging options are available provincewide.

“One big thing that we know drivers of electric vehicles worry about is the concept called range anxiety, that the stations aren’t going to be where they need them,” she says.

Several models of electric vehicle are now capable of travelling up to 500 kilometres on a single charge, says Scott.

Hydro president Chris O’Riley says the new charging sites will encourage electric vehicle drivers to explore B.C. this summer. (The Canadian Press, CHNL)

The Canadian Press

Like us on Facebook and follow us on Twitter.

Just Posted

Nelson childcare centre part of provincial affordable care pilot

The School House Early Care and Learning Centre is one of 53 sites chosen for $200 per month childcare

Nelson faces possible fines for recycling contamination

5.9% of blue bag contents are not recyclable

LETTER: Bear more responsibility

From reader Chris Dawson

Nelson’s Matti Erickson wins provincial gold in photo finish

The L.V. Rogers runner tied with another athlete

Castlegar’s Waterline property purchased; owners to protect it for rock climbers

New owners plan to subdivide, sell bluffs to recreational climbing group

Fashion Fridays: 5 coats you need this winter!

Kim XO, lets you know the best online shopping tips during Fashion Fridays on the Black Press Media Network

California wildfire death toll hits 63

Sheriff says hundreds still missing in nation’s deadliest wildfire

Harsh storms have nearly tripled power outages in last five years, BC Hydro says

More frequent and severe storms have damaged Hydro’s electrical systems since 2013

Trudeau to meet key Pacific trade partners at APEC leaders’ summit

Canada became one of the first six countries to ratify the CPTPP

Judge orders White House to return press pass to CNN’s Acosta

U.S. District Court Judge will decide on White House press credentials of CNN reporter Jim Acosta

WikiLeaks chief could see charges, US court filing suggests

Charges against Julian Assange could help illuminate the question of whether Russia co-ordinated with the Trump campaign

Federal MPs denounce controversial Facebook post targeting Sajjan

Okanagan Conservatives apologize for controversial Facebook post

Canada has enough pipelines to get the moon

Pipelines totalling 840,000 kilometres run across Canada

Migrants streaming into Tijuana, but now face long stay

U.S. border inspectors are processing about 100 asylum claims a day at the main border crossing with San Diego

Most Read