In this Dec. 18, 2020 photo, pipes to be used for the Keystone XL pipeline are stored in a field near Dorchester, Neb. THE CANADIAN PRESS/AP-Chris Machian /Omaha World-Herald via AP

In this Dec. 18, 2020 photo, pipes to be used for the Keystone XL pipeline are stored in a field near Dorchester, Neb. THE CANADIAN PRESS/AP-Chris Machian /Omaha World-Herald via AP

TC Energy halts spending on Keystone XL, says it’s ‘disappointed’ with Biden move

TC Energy said it will stop capitalizing costs, including interest during construction,

Work on the Keystone XL project is being suspended in anticipation of U.S. president-elect Joe Biden revoking its vital presidential permit once he is sworn in, Calgary-based TC Energy Corp. said Wednesday.

The company said it is “disappointed” with Biden’s action expected later today, adding it will overturn extensive regulatory reviews that found the pipeline would transport needed energy in an environmentally responsible way and bolster North American energy security.

It warned the move will lead to the layoffs of thousands of union workers and comes despite its commitments to use renewable energy to power the pipeline and forge equity partnerships with Indigenous communities.

Francois Poirier, who took over as TC Energy CEO at the beginning of the year, said in a statement the company remains committed to growing earnings and dividends through its investments in critical energy infrastructure even if Keystone XL doesn’t go ahead.

“Our base business continues to perform very well and, aside from Keystone XL, we are advancing $25 billion of secured capital projects along with a robust portfolio of other similarly high-quality opportunities under development,” he said.

TC Energy said it will stop capitalizing costs, including interest during construction, effective Wednesday, and will evaluate the carrying value of its investment in the pipeline, net of project recoveries.

It says this will likely result in “substantive” mostly non-cash writedowns in its first-quarter financial results.

Meanwhile, environmental groups applauded Biden’s expected move.

“Killing the Keystone XL pipeline once and for all is a clear indication that climate action is a priority for the White House. This should not come as a surprise to anyone,” said Dale Marshall, national climate program manager for Canada’s Environmental Defence.

“We should take heed when the biggest customer for Canada’s oil kills a pipeline that is already under construction. The Keystone XL pipeline never made sense for either the U.S. or Canada.”

In contrast, Saskatchewan Premier Scott Moe said it’s “incredibly troubling” that TC Energy has suspended work on Keystone XL.

“Now is the time for our nations to strengthen our trading relationship, not erect further barriers to collaborative and sustainable development,” he said in a statement.

The Progressive Contractors Association of Canada said in a news release it is disappointed that Biden is “putting politics before reason” in his anticipated decision to rescind the pipeline permit.

“Pulling the plug on a major project, hours after taking office, is a rocky starting point for re-setting Canada/U.S. relations,” said PCAC president Paul de Jong.

The association, whose member companies employ thousands of Alberta and B.C. construction workers, said the pipeline would have generated as many as 60,000 direct and indirect jobs in Canada and the United States.

On Tuesday, Alberta Premier Jason Kenney urged Prime Minister Justin Trudeau in a phone conversation to continue his efforts to press Biden to allow Keystone XL to proceed.

Kenney’s government has invested $1.5 billion directly in the project, along with loan guarantees, and he has said about $1 billion is at risk if the project is killed.

The 1,947-kilometre pipeline is designed to carry 830,000 barrels a day of crude oil from Hardisty, Alta., to Steele City, Neb. From there it would connect with the company’s existing facilities to reach the U.S. Gulf Coast — one of the world’s biggest oil refining hubs.

TC Energy announced a plan Sunday for the Keystone XL project to achieve net zero emissions by spurring an investment of over US$1.7 billion in communities along the Keystone XL footprint to create about 1.6 gigawatts of renewable electric capacity.

READ MORE: Documents show Biden plans to issue order to cancel Keystone XL on first day in office

The Calgary-based company has also struck a deal with four labour unions to build the pipeline and has an agreement in place with five Indigenous tribes to take a roughly $785 million ownership stake.

Some 200 kilometres of pipe have already been installed for the expansion, including across the Canada-U.S. border, and construction has begun on pump stations in Alberta and several U.S. states.

Biden was vice-president in 2015 when Barack Obama rejected Keystone XL for fear it would worsen climate change.

Trump approved it again in March 2019.

Dan Healing, The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

Joe BidenKeystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

A rainbow shining on Kelowna General Hospital on May 12, 2020 International Nurses Day. (Steve Wensley - Prime Light Media)
New COVID cases trending down in Interior Health

24 new cases reported Thursday, Feb. 25, death at Kelowna General Hospital

Sylvain Fabi, Canada’s chief negotiator for the Columbia River Treaty, joined a number of government and Indigenous government stakeholders for a virtual town hall on Feb. 24, 2021, to update the state of the Columbia River Treaty negotiations. Trevor Crawley photo/Zoom screenshot
Indigenous input key to Columbia River Treaty negotiations

Ecosystem function included in negotiations along with flood management and power generation priorities

Shayna Jones. Photo: Louis Bockner
Kaslo performer collects stories of Black rural experience

Shayna Jones will create a performance piece about Black people ‘tucked away in the countryside’

The Feb. 25, 2021 edition of the Nelson Star might be a little late getting to your door. File photo
Snow delays latest Nelson Star issue

We are done with the white stuff

Provincial health officer Dr. Bonnie Henry updates B.C.’s COVID-19 situation at the B.C. legislature. (B.C. government)
B.C. reports 10 additional deaths, 395 new COVID-19 cases

The majority of new coronavirus infections were in the Fraser Health region

Cannabis bought in British Columbia (Ashley Wadhwani/Black Press Media)
Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

A new survey has found that virtual visits are British Columbian’s preferred way to see the doctor amid the COVID-19 pandemic. (Unsplash)
Majority of British Columbians now prefer routine virtual doctor’s visits: study

More than 82% feel virtual health options reduce wait times, 64% think they lead to better health

Captain and Maria, a pair of big and affectionate akbash dogs, must be adopted together because they are so closely bonded. (SPCA image)
Shuswap SPCA seeks forever home for inseparable Akbash dogs

A fundraiser to help medical expenses for Captain and Maria earned over 10 times its goal

The missing camper heard a GSAR helicopter, and ran from his tree well waving his arms. File photo
Man trapped on Manning mountain did nearly everything right to survive: SAR

The winter experienced camper was overwhelmed by snow conditions

Cory Mills, Eric Blackmore and A.J. Jensen, all 20, drown in the Sooke River in February 2020. (Contributed photos)
Coroner confirms ‘puddle jumping’ in 2020 drowning deaths of 3 B.C. men

Cory Mills, Eric Blackmore and A.J. Jensen pulled into raging river driving through nearby flooding

Ashley Paxman, 29, is in the ICU after being struck by a vehicle along Highway 97 Feb. 18, 2021. She remains in critical condition. (GoFundMe)
Okanagan woman in ICU with broken bones in face after being struck by car

She remains in serious condition following Feb. 18 incident

Vancouver International Women in Film Festival kicks off March 5.
Women in Film Festival features two B.C. filmmakers

The 16th annual festival kicks off March 5, 2021

The booklet roots present day activism in the history of racist policies, arguing the history must be acknowledged in order to change. (CCPA)
New resource dives into 150 years of racist policy in B.C.

Racist history must be acknowledged in order to change, authors say

Most Read