Pro-pipeline rally at Alberta legislature, addressed by Economic Development Minister Deron Bilous, April 18, 2018. (Chris Schwarz/Alberta government)

B.C. VIEWS: Justin Trudeau left himself no choice on pipeline

Federal Liberals undermined National Energy Board, then realized the cost

“I long for the days of Stephen Harper,” B.C. Green leader Andrew Weaver said when he heard the news that the Justin Trudeau government had agreed to buy the 65-year-old Trans Mountain pipeline.

Weaver wasn’t kidding. “At least you knew where he stood,” he explained, contrasting that with Trudeau’s spinning weathervane of positions on Alberta’s oil industry.

While campaigning in 2015, Trudeau talked frequently about what he called the flawed National Energy Board hearings that approved Trans Mountain. But after forming government, his cabinet approved it too.

The Trudeau government then launched a promised overhaul and renaming of the NEB. Changes include opening up hearings to even more stacking by organized opponents than we saw with Northern Gateway and Trans Mountain.

As a result, this may be the last major Canadian oil pipeline ever approved, which is at least consistent with Trudeau’s recent musing in Europe that he wishes he could phase out Canada’s oil industry sooner.

Trudeau set the stage for nationalizing Trans Mountain by cancelling Northern Gateway to Kitimat, with his glib line about the “Great Bear Rainforest” being no place for oil tankers. Not just Alaska crude tankers but large ships of all sorts ply the waters off B.C.’s coast, and the Trans Mountain expansion is the main way to finance additional marine protection that everyone agrees is needed, pipeline or no pipeline.

Kinder Morgan Canada committed $150 million to improve the capacity of Western Canada Marine Response Corp., the industry-funded agency that works with the Coast Guard to prevent and clean up spills. I’m advised that the federal takeover means work can resume on this, after Kinder Morgan suspended financing.

WCMRC plans include response bases at Burrard Inlet, on the Lower Fraser River, Nanaimo, Port Alberni, Sidney, Beecher Bay in the Juan de Fuca Strait, as well as an offshore supply vessel to be based at Ogden Point in Victoria. This is in addition to heavy rescue tugs and other Coast Guard improvements Trudeau announced with his original decision to proceed with Trans Mountain.

You’re a part owner of the pipeline, for now at least, but you don’t have to pay for the new spill response plan. That money comes from charges on the shippers of oil.

The deal worked out by Ottawa means Canadian taxpayers own the existing pipeline, the storage and terminal facilities at Burnaby, and the expansion project in its current state, including new pipeline installed years ago in Alberta without protest.

You are also part owner of large stacks of new pipe for the project, sitting at the railside near Kamloops. Kinder Morgan agreed to continue managing the project, so part of the purchase price is a management fee.

That’s what we get for the $4.5 billion price tag, the pipeline-related assets. The cost of the expansion, pegged at $7.4 billion before the latest round of uncertainty and political battles, is to be financed by Ottawa. So call it $12 billion for now.

You should also know that Kinder Morgan hasn’t agreed to sell all of its assets in Canada. As CEO Steve Kean told analysts on an investor conference call last week, Kinder Morgan retains its Vancouver wharves terminal, the largest mineral concentrate import-export facility on the west coast of North America.

And if you really don’t want this pipeline expansion to continue, consider this. Kinder Morgan owns the largest crude storage and rail loading terminal in North America, at Edmonton. In the absence of pipeline capacity, the rate of crude oil traveling across B.C. by rail can only continue to rise.

Tom Fletcher is B.C. legislature reporter and columnist for Black Press. Email: tfletcher@blackpress.ca


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Former Nelson swimmers competing in NCAA

Jordan and Kelsey Andrusak will be rivals in in the Western Athletic Conference

CHECK THIS OUT: Don’t let reading fall by the wayside this summer

Avi Silberstein is the children’s librarian at the Nelson Public Library

Kootenay students learn about lake stewardship

Two hundred and fifty students from around Kootenay Lake participated in the Youth Water Festival

Restoration underway on Nelson cenotaph

The Nelson War Memorial was constructed in 1922

Air Canada reviewing how crew left sleeping passenger on parked plane

In a Facebook post, the woman said she woke up ‘all alone’ on a ‘cold dark’ aircraft

Crews fight wildfire along Sea-to-Sky Highway

A cause has not been determined, although a downed power line is suspected

PHOTOS: Event marks one year since soccer team rescued from Thai cave

Nine players and coach took part in marathon and bike event to help improve conditions at cave

Rock climber dies after fall at Stawamus Chief in Squamish

The man had fallen about 30 metres while climbing in the Grand Wall area

Five B.C. students taken to hospital after playing with vaping device

School district said students were taken to hospital ‘out of an abundance of caution’

Being a pot dealer is not what it used to be

Sunday Big Read: the business of selling marijuana in B.C. is a slow bureaucratic slog

VIDEO: Two more pride flags have been stolen from Langley woman

Lisa Ebenal was “angry” and “fed up” after the latest theft. Then people started showing suppport

B.C. couple who has raised 58 children turns to community amid cancer diagnosis

Family who raised, fostered and adopted many kids hoping to gain some precious together time to fight cancer

Canucks acquire forward J.T. Miller from Lightning

J.T. Miller, 26, had 13 goals and 34 assists for the Lightning last season

Most Read